Bortolo & Sons Paving Co. LTD.
Category
General Information
Phone: +1 604-298-8775
Website: www.bortolopavingandconcrete.com/
Likes: 113
Reviews
Facebook Blog
Recent residential paving project on Marine drive, West Vancouver. Pics #1 & #2, are after Pics Pic #3, is a before Pic Pic #4, is of our excavation phase Pic#5, is of our gravel prep phase, essential to a long lasting driveway.
Type of concrete work services we provide.
Before & after pictures, for major concrete renovations, at 1255 Ellis street, Port Coquitlam
1186 Laurier Street, Vancouver After pictures of new exposed aggregate walkways, rear interlocking paver patio, & asphalt driveway.
Asphalt, exposed aggregate, and interlocking paver project located at 1186 Laurier Street, Vancouver before pictures.
Progression of new retaining walls and staircases almost complete, at strata warehouse complex. Once forms stripped, we will backfill and complete asphalt restoration.
This is an asphalt driveway, concrete carport, & sidewalk, along with stack stone hardscaping project we did last June, in #NorthVancouver. Still looks awesome. We also removed & replaced their perimeter drainage collector sump which was collapsing because it was made out of wood which was rotting. #blacktop #northVan #paving
Removing and replacing a 1400 ft2 concrete driveway at 1430 Apel drive, Port Coquitlam. We will also be supplying and connecting a 18" diameter by 24" deep drainage catch basin, along with 16 linear feet of trough and grate drainage system.
Starting the removal & disposal phase of a new asphalt driveway at 1818 Riverside drive, North Vancouver.
Starting a project in North Vancouver, where Bortolo and Sons will be installing a interlocking paver rear patio, and concrete driveway. The interlocking paver patio will be installed in a parquet 90 degree pattern. The concrete driveway will have a smooth finish, and reinforced with buckeye fibers.
Another happy customer. Exposed aggregate driveway in Tsawwassen completed.
Tsawwassen project progress report, prepped, rebar installed, and exposed aggregate pour scheduled for this Wednesday Feb 10th, weather permitting.