Broadview Homes at Ravenswood Airdrie
2009 Ravensdun Cres T4A 0W5 Airdrie, AB, Canada
Category
General Information
Locality: Airdrie, Alberta
Address: 2009 Ravensdun Cres T4A 0W5 Airdrie, AB, Canada
Website: www.broadviewhomescalgary.com
Likes: 364
Reviews
Facebook Blog
Working with new home buyers this year, we’ve noticed new design trends emerging as a result of us all staying at home more. Discover the top 3 trends on our blog.
There’s peace of mind that comes with a warranty. Before you build, find out if your new home comes with a guarantee.
There’s a lot that goes into building your new home. Do you know the person who will help guide you through the process?
Standards are good, but long-lasting is even better. Asking this question of a potential new home builder can help you learn about their build quality even if you know nothing about construction.
Do you know what the top upgrade was for new homes in Calgary? Check out our latest research to see what were the most popular features and which one was #1.
Ensuites are often where we start the day as well as end the day. Discover what must-have features new home buyers in Calgary are adding to their ensuite.
Cory and Angela, siding on the second duplex is almost finished. Two of the suites have been drywalled. We are currently we are working on drywalling the other two.
Happy Canada Day, everyone! Wishing you and your family a memorable day as we celebrate what it means to live in this great country. If you're planning to stop by one of our showhomes, we'll be open from 12 noon to 5pm today.
Charity and Mat, flooring is finished throughout. Faucets and most of your light fixtures are installed. Appliances have been delivered. Currently we are working on shelving.
Wondering what Calgary new home buyers are putting into their kitchens? Here are the top five upgrades in our homes over the last five year.
Charity and Mat, lots of activity at your place over the last week. Your sidewalk and garage pad have been poured. All your countertops are installed. Interior doors are painted. Tile is almost finished. Currently we are installing your main level flooring.
Cory and Angela, siding is completed on one of your duplexes! Work continues on the second one.
Being a father brings responsibilities and plenty of joy. Here's to all the fathers who make being a hero a daily occurrence. Happy Father's Day!
Charity and Mat, all your casings are installed and painting is underway!
Cory and Angela, plumbing and heating is finished in both our your duplexes. Electrical is also done in one duplex and we are working on the other one. Also we started your siding installation today.
Terry and Andrea, flooring is finished throughout! Hardware and light fixtures are installed. Fireplace stone is also completed.
Charity and Mat, your cabinets have been installed! All your interior doors are installed as well. We are currently working on baseboards and casings.
A simple change may take your new home from okay to outstanding! If design matters to you, then remember to ask this question before you get started. https://hubs.ly/H0qRNLg0
Rough ins are happening at both sets of units for Cory and Angela and basement floors are now prepped for concrete! Basement framing lumber is on site too!
Charity and Mat’s drywall is installed, mudded and taped, ceilings are textured! Next comes primer, then - cabinets!
Adriana’s appliances aren’t installed and light fixture are in!
Terry and Andrea’s exterior stone is done, countertops are in and tile work is finishing up!
Charity and Mar, your exterior trim is painted, exterior railing is installed and drywall is in full swing!
Terry and Andrea, your exterior trim is painted and railing is stained inside. Wall paint happening as we speak!
Derek and Kasia your siding and shakes are done and drywall is installed inside!
Adriana your mirrors are in, tile work finishing up in the en-suite, fireplace trim is installed and door hardware is on!
Cot and Angela, both sets of units now standing with windows installed!
Home is where your mom is. Today, we honour all the women in our life who support and nurture us, from our sister to our grandmother. Happy Mother’s Day!
Terry and Andrea, your garage door is in, exterior railing is done, doors and casings are installed inside and paint prep is finished! Paint is next!
Lots happening in Adriana’s home! Exterior stone and staining is done, tile work is done, flooring is in on main floor and carpet is done too! Looks great!
Charity and Mat - your siding is done!
Cory and Angela, one set of units is framed with windows installed and the other has roof trusses work in progress!
Now that the weather has improved , it’s the perfect time to inspect your home after winter. If you’re unsure where to start, here’s our checklist on what to inspect and what to look out for around your home. https://hubs.ly/H0q4hbd0
Siding work is almost done for Charity and Mat!
Terry and Andrea your siding work is finishing up and your door package has arrived! Railings are installed too!
Derek and Kasia, garage floor is poured, exterior window battens are installed and all electrical is now finished!
Adriana your siding is done, garage door is in, stone prep is done and beam staining is in progress as we speak!
Cory and Angela, one set of units is now standing and the other has first floor walls up!
Here is a video walk through of our Tallyn floor plan! 2629 sq ft with 4 bedrooms and an awesome kitchen! https://www.dropbox.com/s/7x6i6y/21%20Crestbrook%20Way.mp4
Sherwyn and Marifel, your Home is almost possession ready for next week!
Terry and Andrea, cabinets are done, coat of paint is on the walls and subfloor for tile is installed!
Derek and Kasia, your electrical rough ins are finished, fireplace is in, flooring cut lines are marked, HVAC system is set up and cabinet locations are marked out!
Adrianna, you casings, doors, and railings are painted, along with pantry shelves! Walls have a coat of paint too!
Cory and Angela, two units have the mail floor up and the other two units have started to compile lumber and stairs to start framing!
Charity and Mat, all your rough ins are finished, cabinet locations are marked out and exterior window trim is done!
Here is a virtual walk through of our Cascade IV showhome! https://www.dropbox.com//369%20Ravenstern%20Link%2C%20Aird
We at Broadview are thankful for our customers and the trust you have placed in us. Any homeowner with an active 1 year warranty as of March 1, 2020 will now have an additional year added to their warranty. We recognize peace of mind is important during this uncertain time and, as part of the Qualico group of companies, want to assure you we are committed to caring for you and your home.
Wishing you and yours a happy and very special Easter today.
Adriana, your cabinets have been installed! Pantry shelving and railings are also installed!
Terry and Andrea, your drywall has been installed!
Derek and Kasia, framing has been completed and all your windows and doors are installed. Plumbing and heating is also finished and we are getting started on your electrical.
Cory and Angela, your foundation has been completed. DMX foundation wrap and weeping tile are installed! We have started to backfill, framing to start within a week.
Charity and Mat, plumbing, heating and electrical have been installed! Inspection should be this week, we will then start installing your drywall.
A huge thank you to our wonderful home owners - for trusting us to build your homes, and for your crucial input once we've started our journeys together! Because of you, we are honored to be a Best Customer Experience Finalist at this year's Home Owner Mark of Excellence Awards. The awards will be a little bit different this year as they are held remotely this afternoon; however, the sentiment remains the same. Working alongside you to turn your dream home into a reality is our passion, and if you are excited about your home for many years to come then we have truly done our jobs right. Congratulations to all of our fellow finalists, as well!
Plants, paneling, pineapples? There are so many ways to bring the tropics into your home, even if the snow insists on falling outside!
Make your home work for you (especially while you work from home!) We advise our home owners to keep a regular maintenance schedule in their homes so that they never fall behind. Here are some items you can do before the end of March for some serious peace of mind! - Clean range hood filters - Ck your smoke alarm and CO detector batteries and test - Clean humidifier (really important in this climate right now)
Working from home will be the new norm for many of us for a little while, and that can be an enjoyable, productive experience if done right! Straight from our archives, here are some tips to help you create a space that works the way you need it to.
Cory and Angela, your lot excavations are underway!
Derek and Kasia, framing is underway!
Charity and Mat, your plumbing installation has been completed! We are working on your heating and ventilation today!
Adriana, your drywall has been installed!
Terry and Andrea, your electrical installation is finished!
The health and safety of our customers, the public, and our staff is always our top priority. We recognize we all have a role to play in limiting the spread of COVID-19; this means reducing contact with others for the time being. As such, we are temporarily closing our showhomes to the public and will remain open by appointment only until further notice. To view any of our homes in person or speak with a Broadview representative, please contact the appropriate Area Sales Mana...ger via our website ( the proper contact information can be found at https://hubs.ly/H0nKn2w0) Rest assured that Broadview is still working hard with beautiful homes under construction now; we invite you to browse our new homes for sale, watch the progress of projects that are underway, and chat with us via Facebook, Instagram, and our website. We look forward to resuming normal operating hours when we have all flattened the curve together! Sincerely, The Broadview Homes Team
St. Patrick's Day may be a bit quieter than usual this year, but you can still celebrate in your own home with a great meal. All it takes is a few staple ingredients from your pantry. May the Luck of the Irish be with you today!
Charity and Mat, framing is finished! Also your doors and windows are installed.
Adriana, drywall installation started today!
Terry and Andrea, plumbing and heating is finished! Electrical installation is underway.
Adriana, your electrical is finished!
Charity and Mat, your main floor framing is finished! The second level is currently in progress.
Popular Listings
Galko Renos
1 1401 28 Street North T1H6H9 Lethbridge, AB, Canada
+1 403-329-3221
Contractor, Home improvement
Excavation Rapcor
3030 Rue Desmarteau H1L 4N9 Montreal, QC, Canada
+1 514-880-5478
Contractor, Home improvement, Construction company, Demolition & excavation company
Les Pavages JW
+1 438-881-4153
Contractor, Home improvement, Paving & asphalt service