Mosher Construction 14.02.2021

Merry Christmas to everyone that I have met and worked for this years. I was a pleasure getting to know you. Have a great New Years.Merry Christmas to everyone that I have met and worked for this years. I was a pleasure getting to know you. Have a great New Years.

Mosher Construction 25.01.2021

Shelving is done and I will put french doors up tomorrow. Cabinet doors will get done as soon as I have the room to make them. Have some more work around the doorway but this will let clients move stuff into this room. I'm out of this room tomorrow and then on to the rest of the basement.

Mosher Construction 18.01.2021

It was a nice day to switch out this old door for a new one. Sometimes you don't need to change the door frame...

Mosher Construction 11.01.2021

Love doing kitchens!!!

Mosher Construction 21.09.2020

Sprucing up this small powder room...

Mosher Construction 13.09.2020

Before and after pictures...

Mosher Construction 30.08.2020

Was told i should probably edit this... I did not do this caulking job. In fact I demoed the whole kitchen and found all this calking from whoever originally worked on it.

Mosher Construction 13.08.2020

Starting a new project today... Complete gut of kitchen and then install new one.

Mosher Construction 24.07.2020

Priming is done and tomorrow finish coats...

Mosher Construction 06.07.2020

Some pocket holes to plug and sand then tume for primer.

Mosher Construction 26.06.2020

Custom newel post and rails.

Mosher Construction 09.06.2020

My small shop setup at a clients home. Its small but so useful when I can park my trailer in front of the garage...

Mosher Construction 30.05.2020

Painting doors, and getting them installed.

Mosher Construction 17.05.2020

I haven't posted in quite awhile... Current renovation project I'm doing.

Mosher Construction 12.05.2020

Just another day at Mosher Construction...

Mosher Construction 08.05.2020

Just and update on Mosher Construction's latest job...

Mosher Construction 29.04.2020

So drywall is up and I started mudding and taping on Thursday. Under this set of winders was interesting to do. By the time I'm done I think it will look really good.

Mosher Construction 18.04.2020

Started insulating today and picked up drywall. Unfortunately before we could get it off the truck it poured rain.

Mosher Construction 12.04.2020

Been busy these last 2 weeks and haven't been posting. This is my latest project. Storage room, bathroom, laundry/mechanical and family room. Clean up day is Monday, I've been shuffling things around this small space, be glad to clear it all out. Should get insulation done Monday afternoon also. Tuesday should be drywall day...

Mosher Construction 03.04.2020

I've been busy the last 2 days getting everything stained, sealed and painted.

Mosher Construction 01.04.2020

Have spent a few days staining my shelving. Will give it a copy of polyurethane and stain the drawer fronts a different color. For the moment my trailer is a disaster lol.

Mosher Construction 18.03.2020

Sometimes I make things just because my wife asks. 2 more to paint and install. It's going to be beautiful here...

Mosher Construction 08.03.2020

I believe that Home Depot needs a contractor entrance. Have to wait 20 minutes to get 4 bolts is crazy. A lot of people here are diyer's or returning stuff. Takes about an hour out of my work time.

Mosher Construction 17.02.2020

Home Depot is now taking returns, they need a separate entrance and area for it.

Mosher Construction 30.01.2020

Just a little painting

Mosher Construction 15.01.2020

Its been a great day lol....

Mosher Construction 04.01.2020

The newest member of Mosher Constructions family...

Mosher Construction 20.12.2019

Today's video... Grouting black hexagon tile.

Mosher Construction 16.12.2019

Installed the last of my storage units into my trailer, now just some organizing and it will be finished. Maybe I should sell it and build another one.

Mosher Construction 06.12.2019

Doesn't look great yet but by Tuesday this shower will be grouted. Stay tuned for more updates...

Mosher Construction 27.11.2019

Working with porcelain, hexagon tiles is a real pain... Not the best pictures

Mosher Construction 17.11.2019

Finished this this morning. Have the garage door open and it's raining outside. Good day for puttering... Large vacuum will fit in bottom spot.

Mosher Construction 11.11.2019

Work for the day... Tile means we are getting close to the done point.

Mosher Construction 06.11.2019

Version 3.0 of my trailer is a 1/3 done... #ronpaulk #paulktrailer #mosherconstruction

Mosher Construction 28.10.2019

A tip for making sure dado's will line up. #ronpaulk #smarttrailer #mosherconstruction

Mosher Construction 09.10.2019

When your dado's need to be straight and you have lots to do.... LOVE MY DEWALT LOL

Mosher Construction 19.09.2019

Building a door jamb...

Mosher Construction 10.09.2019

Just an update on my trailer... #ronpaulk #smarttrailer

Mosher Construction 08.09.2019

Had to wait for an order from Home Depot so I kept working on my trailer. Got 9 drawers done...