1. Home /
  2. Local business /
  3. West Coast Live Edge


Category

General Information

Phone: +1 250-418-1426



Likes: 143

Reviews

Add review



Facebook Blog

West Coast Live Edge 28.09.2020

7' by 36" live edge fir table

West Coast Live Edge 21.09.2020

Live edge dining table in it's new home.

West Coast Live Edge 05.09.2020

New coffee table! 2" thick, 23" wide, 5' long and 20" off the ground.

West Coast Live Edge 16.08.2020

Live edge kitchen island made of salvaged Douglas Fir.

West Coast Live Edge 02.08.2020

Newest slab going into the 17mile pub. I'm dropping in for a beer soon.

West Coast Live Edge 29.07.2020

These slabs have been sanded to 120 grit, 4 and 5 feet long. Looking forward to putting a finish on these!

West Coast Live Edge 12.07.2020

Coming soon! Two slabs sanded and planed and ready to be turned into coffee tables (4ft and 5ft). Here's a little sample piece sanded down to 220grit.

West Coast Live Edge 08.07.2020

Great to see what one of my customers turned his slabs into. Entrance bench and an outdoor table.

West Coast Live Edge 21.06.2020

I have 4 of these huge cedar cookies. Roughly 2.5" x 34" x 51". Set up an appointment and come take a look for yourself

West Coast Live Edge 17.06.2020

Here's one of our slabs finished and installed in The Merridale Cidery & Distillery Tasting room. Superb job keeping the bark on! Finish work done by Chad Rennie (778-400-4430) Get in touch with Silver Saws Milling to start your next project! (250-418-1426)

West Coast Live Edge 08.06.2020

Going into the Merridale Cidery & Distillery tasting room in Cobble Hill, can't wait to see the finished product!

West Coast Live Edge 31.05.2020

Had some fun cutting up these salvaged stumps and logs, could make some really nice coffee and side tables! Cedar and Garry Oak!

West Coast Live Edge 10.05.2020

Slabs stayed nice and flat in the kiln, looking good!

West Coast Live Edge 22.04.2020

Kiln dried slabs are ready for pickup! Buck is guarding the slabs for now.

West Coast Live Edge 06.04.2020

Slabbing saturdays

West Coast Live Edge 04.04.2020

Big slabs going into the kiln soon! The slabs will be dried to %10 and ready to work on IMMEDIATELY! They should be out of the kiln in 10-12 days.

West Coast Live Edge 22.03.2020

Unfortunately, this tree had to be cut down; it was growing into a house's foundation. It had been there for a while, up to 40" diameter at the base.

West Coast Live Edge 14.03.2020

Behind the scenes shots